Design Phase
1. Study overall situation of the facades in light of requirements set by client/project and
identify the services to be incorporated into façade and manage overall Architectural
Cladding Fixation works.
2. Assist in selection of cladding and appropriate fixation system.
3. Assist in writing specification by selecting appropriate material supplier.
4. Prepare Shop Drawings for Architectural Cladding as well as the Fixation Drawings
(Typical details & Elevation Drawings) as per complex geometry of the façade
5. Overall coordination of Architectural Elevations with structural elevations,
architectural schedules architectural cladding drawings and cladding fixation system
drawings.
Construction Phase
1. Work on any above mentioned if we join during construction phase and find that those
responsibilities were not carried out during design phase.
2. Schedule cladding fixation works, prepare logs and progress reports to control the
cladding work within specified time line.
3. Through thorough coordination and proactive approach Identify engineering issues &
prepare proposals to solve the issues in an effective way.
4. Get approval from consultant through approved engineer on any modification
required in drawings/proposals as per site condition.
5. Manage cladding fixers, provide them approved details & solutions for all issues arising
at site.
6. Coordinate with material suppliers and control all material deliveries as per the takeoff
quantities.
7. Supervise fixation work at site to assure that the work is as per contract/approved
drawings.